When some persons are authorized to perform the same task, each staff must complete its own lockout and tagout process, rather than others.
Never authorize others to remove your lockout device.
Only operate the device that has been locked by safety lockout.
When you shift,must not arbitrarily terminate the original lockout device listing until the carry personnel is in accordance with the requirements ofthe lockout tagout, then remove the original lockout or tagout. At the same time, the new carry personnel should confirm the LOTO is safe andreliable before operation.
Never let your security rely on others’ LOTO, always remember use your safety lockout protect yourself.
Use the correct lockout, so please find the item in the catalog according to the actual situation.
Make sure that safety lockout is able to withstand the environment in which it is located like dusty, humid and so on.
Safety lockout and safety tagout should be combined in usage, and can not replace each other.
Since 2rd +anuary, 1990, whenever the machinery and equipment change, overhaul, remould or innovate, even install
new machinery and equipment for the machines and equipment, the energy isolating device and the equipment should be designed to fit the safety lockout and tagout.
Operators should test the ability control rules at least once a year, ensure the standard procedures and requirements are implemented. The authorizedemployees perform regular inspection, rather than the staff who perform energy control rules carry out testing.
If there is a possibility that the storage of energy should be saved to reach the dangerous level. It should continue to be verified, repair or maintenancethe energy source, untill the danger don’t exist.
Whenever external maintenance personnel is take part in the maintenance activities within the permission, the site operators and the external operatorsshall inform lockout or tagout rules to each other.